Free ISEB-SWT2: ISTQB-ISEB Certified Tester Foundation Level Exam Questions and Answers
124 verified practice questions for ISEB-SWT2.
The first 10 questions on this page are free to read, answers included — no account and no card. A plan opens the rest of the bank, the full timed practice test and your weak-topic reporting.
Last updated: September 19, 2026
- Provider
- ISEB
- Questions in our bank
- 1000+
- Free to read
- First 10, with answers
- Our test mode duration & pass mark
- 130 mins · 70%
- Verified answers
- Reviewed weekly
- Practice format
- Multiple choice
Recommended: Switch to Test Mode to start a practice test that simulates the real exam experience.
Question #1
Consider the typical objectives of testing. Which of the following metrics can be used to measure the effectiveness of the testing process in achieving one of those objectives? 1 credit
Please select an optionIncorrectCorrect answer: B
A typical objective of testing is to verify that requirements are fulfilled, so requirements coverage measures how effectively testing achieves it. The other metrics gauge efficiency or developer productivity, not test effectiveness.
Was this answer correct?Question #2
Which of the following would you least expect to form part of the analysis of initial tool costs? 1 credit
Please select an optionIncorrectCorrect answer: C
Integration effort, learning time and evaluating candidate tools all consume money when a tool is introduced; portability is a technical attribute of the tool, not an initial cost.
Was this answer correct?Question #3
Which of the following would be the most significant input to estimating the time to carry out the specified testing tasks? 3 credits
Please select an optionIncorrectCorrect answer: C
Metrics recorded from earlier testing are the most significant input, because they show how long comparable test tasks actually took; developer skills or team size influence the estimate far less.
Was this answer correct?Question #4
Which of the following is a project risk mitigation step you might take as test manager? 1 credit
Please select an optionIncorrectCorrect answer: C
Project risks threaten the test project itself, so arranging a back-up test environment mitigates the risk of the environment failing. Performance testing addresses product risk, and hiring after a resignation or holding a retrospective are reactions, not preventive mitigation.
Was this answer correct?Question #5
In general, why is it NOT a good idea to estimate the testing effort based only on a percentage of development effort? Identify THREE valid reasons. 1 credit
Select 3 answers.
Please select an optionIncorrectCorrect answer: A, D, E
A percentage of development effort inherits any weakness in the development estimate, ignores how much risk the application carries, and overlooks organisational factors such as test basis quality and tool availability.
Was this answer correct?Question #6
During test process improvement it is recommended to use standards where possible. Standards originate from various sources and they cover different subjects in relation to testing Pick TWO sources of software standards, useful to software testing from the ones mentioned below. 1 credit
Select 2 answers.
Please select an optionIncorrectCorrect answer: A, C
ISO 9126-1 provides a product quality model, and BS 7925-2 covers software component testing techniques, so both are genuine standards useful for testing. ISA 4126-1 and SY-395-01 are not real standards, and IEEE 829 is misdescribed as universally mandatory.
Was this answer correct?Question #7
Which THREE activities would be valid steps during the development of the test strategy?2 credits (2 out of 3 correct 1 credit)
Select 3 answers.
Please select an optionIncorrectCorrect answer: C, D, E
Developing a strategy means understanding the life cycle in use, assessing what testing is needed to reduce risks, and having the resulting document reviewed. Naming staff, defining career paths, plan templates and project risk analysis belong to planning or organisational work.
Was this answer correct?Question #8
The development manager is managing the review of the responses received from bidders, and has asked the in-house test manager to provide a review checklist for the test management aspects of the responses. Which of the following checkpoints would be appropriate? 2 credits
Please select an optionIncorrectCorrect answer: D
A realistic checkpoint is that the bidder's test plan shows a credible phased implementation and that test documentation follows a recognised standard such as IEEE 829 as a guide. The others demand full conformance or state facts that a checklist cannot verify.
Was this answer correct?Question #9
As a result of the RAD based development approach, the test manager has decided to change the risk mitigation approach. Which test technique might be most appropriate to use? 2 credits
Please select an optionIncorrectCorrect answer: D
RAD delivers rapidly changing increments with little formal specification, so exploratory testing, where design and execution happen together, adapts best. Decision tables and boundary value analysis need stable, documented specifications.
Was this answer correct?Question #10
Given is the following defect removal chart reported at the end of system testing - showing total defects detected and closed defects (fixed and successfully retested). A number of open defects are classified as critical. All tests have been executed. Based on the chart above, what is the most appropriate next test phase? 1 credit
Please select an optionIncorrectCorrect answer: D
All tests have run but critical defects are still open, so the software cannot yet move to acceptance testing. Another system test cycle is needed to verify that the fixes resolve the outstanding defects.
Was this answer correct?
Continue with ISEB-SWT2: ISTQB-ISEB Certified Tester Foundation Level
Unlock the full question bank
You have read the first 10 questions. A subscription opens every question in ISEB-SWT2: ISTQB-ISEB Certified Tester Foundation Level, the full timed practice test, and your progress and weak-topic reporting.
Single exam
$19.99for 30 days
Full question bank and practice test for one exam, for 30 days.
Single exam
$49.99for 1 year
One exam for a full year. Nothing renews and nothing to cancel.
Full access
$39.99/mo
Every exam in the catalogue, month to month.
Full access
$199.99/yr
Every exam in the catalogue for a year.
Already subscribed? Sign in to pick up where you left off.
Other ISEB certifications
Reviews
★★★★★
This platform is a lifesaver. The practice questions and explanations are so detailed. It’s the best study tool I’ve ever used.
Hannah Smith
USA
★★★★★
I highly recommend Exam Practice. The feedback after each test helped me improve significantly, and I passed my exams easily.
Oscar Nyström
Sweden
★★★★★
Exam Practice is worth every penny. The mock exams are realistic, and the feedback helped me focus on key areas.
Amit Sharma
India



